Donor: Brazilian Government Concession
Budget: € 1,800,000

Project Description: 

The project consisted in feasibility study and definition of civil works, equipment and facilities to improve the use of hydro-electricity. The project included technical assistance and consulting for the implementation of activities, and provided basic and detailed engineering services.

The activities carried out included:

  • Topographic and cartographic work;
  • Geological and geotechnical investigations;
  • Hydraulic design for the dam structure;
  • Study of general water jump disposition;
  • Analysis of possible closures and dam typology;
  • Warning and flood prevention systems;
  • Hydraulic and risks analysis;
  • Construction plans, etc.