Donor: Private (GISA)
Budget: € 3,540,000
Services: € 351,000

Project Description:

The project included construction of an educational centre in Ceip Barbera, in Barcelona consisted of two lines. The main structure has been built in “L” shape, and the building has 3 wings. Two of them are parallel and are separated by an open patio. On the ground floor, there are pre-school classes, while at the first and second floor, are the classes for primary student levels. In the second wing are the common services. The total surface of the project was 2,363 m2.

Activities conducted within the project included:

  • Direction of works execution;
  • Control of terms of execution and payments;
  • Cost control;
  • Quality and safety control.