Donor: ARKA
Budget: € 1,200,000

Project Description:

The aim of the project was to elaborate a detailed design of an industrial wastewater treatment plant in Spain and to carry out the contract management and works supervision of this industrial WWTP.

The following activities were carried out throughout the project:

  • Industrial discharges measurements;
  • Preliminary design of the WWTP;
  • Environmental impact assessment;
  • Detailed design;
  • Preparation of tender documents, following Spanish Standards (similar to FIDIC);
  • Financial and economic analysis;
  • Preconstruction activities; assistance for the procurement of works and equipment;
  • Contract management; following Spanish Standards;
  • Works supervision;
  • Regular inspections and testing;
  • Monitoring activities, etc.