Donor: Spanish Ministry of Public Works
Budget: € 1,099,800

Project Description:

The project aimed at designing and construction of Vigo’s (300,000 inhabitants) motorway bypass, 8,4 km long, with 2,3 and 4 roadways in each side. It includes 6 viaducts (1,270 m long), 13 superior and 1 inferior steps, and also a 260 m tunnel. The bypass also includes 6 connections with other roads, including the access to the A-57 highway.

The project included the following activities:

  • Environmental impact assessment;
  • Assistance to contracting authority in procurement and contracting;
  • Contract management;
  • Works supervision;
  • Engineering.