Donor: BUSKI (Bursa Municipality)
Budget: € 495,000

Project Description:

The purpose of this project was to supervise the implementation of the SCADA, a system established, which has two servers configured in redundancy, based centralized management system at a location determined by BUSKI. The system monitors and controls potable water production, purification, collection and distribution stations/networks, which are located in a large geographical area within the borders of the city of Bursa, where BUSKI is responsible for operation and maintenance.

The project consists of 5 sub projects:

  • Waster water treatment plant works;
  • Storm & Wastewater drainage works;
  • Water supply works;
  • Consultancy and supervisory services;
  • Other works

Activities carried out within the project included:

  • Supervision of the Project’s execution under engineer’s concept according to FIDIC (Yellow book);
  • Supervision, revision and approval of the detail engineering prepared by the SCADA Contractor;
  • Assistance to the Beneficiary during the development and installation of the project (SCADA System);
  • Supervision of the design and implementation of the Control Centre;
  • FAT and SAT test of the whole equipment and of the SCADA System (software and hardware); and
  • Final acceptance of the system in operation.