The aim of the project was to provide support to the Railway Infrastructure Administrator in the design of one of the sections (Mondragon-Elorrio) of the high speed railway line Vitoria-Bilbao-San Sebastian (western part).

Activities carried out throughout the project included:

  • Alignment alternatives study based on Preliminary Design;
  • Conceptual Design based on technical, economical and environmental criteria;
  • Detailed design of the infrastructure, including superstructure, cable crossings, posts anchors in viaducts, etc;
  • Support to the works direction regarding design changes from the basic design;
  • Assistance on specific solutions in critical conceptions of the design.