This feasibility study and detail design project of the High Speed Rail Line Madrid – Galicia, included the following activities:

  • Alignment alternatives study based on Preliminary Design;
  • Feasibility study of proposed alternatives, economic and financial evaluation, comparison and Cost Benefit Analysis;
  • Conceptual Design of the best solution based on technical, economical and environmental criteria;
  • Detailed design of the infrastructure;
  • Support to the works direction regarding design changes from the basic design;
  • Assistance on specific solutions in critical conceptions of the design.